Get a Quote

Complete coal preparation plants from 200,000 to 5,000,000 TPY — process design, equipment supply, installation and commissioning.
Already have a washability report? Send it — we size the machine from your coal, not from a catalogue.

The questions that decide whether this equipment fits your plant, answered directly.
| Buyer question | Dehui Mining answer |
|---|---|
| What scale of plant do you deliver? | Complete coal preparation plants from 200,000 to 5,000,000 TPY — process design through commissioning. |
| What is included in turnkey scope? | Flow sheet design, equipment supply, structural steel, electrical and automation, installation supervision, commissioning and operator training. |
| Which coal types do you build for? | Power coal, coking coal and slime treatment systems — each flow sheet balanced from your washability data. |
| How is the flow sheet decided? | From four balances: crushing size, washing depth, water balance and product moisture — set from your coal, not from a template. |
| How long does a turnkey plant take? | Typically 8–14 months to commissioning depending on civil works scope. |
| Do you work outside China? | Yes — including a 1.2 million TPY export project delivered in Zimbabwe. |
| What warranty comes with a plant? | 12 months from commissioning on main equipment, with wear parts stocked. |
| What should my first inquiry include? | Annual capacity, coal type, feed size and target product — enough to draft the first flow sheet. |
Three duties this equipment is built for. Each application page carries the full process detail and field notes.
200,000–5,000,000 TPY thermal coal preparation.
Deeper washing with fines and slime recovery.


Dehui delivers plants across the 200,000 to 5,000,000 TPY range. We start from your coal washability data and product requirements, then size every unit against the same mass balance so no single machine becomes the bottleneck.
Indicative ranges only. Final figures are fixed once your coal data and site conditions are confirmed.
| Parameter | Typical range | What decides it |
|---|---|---|
| Plant capacity | 200,000–5,000,000 TPY | Selected from your annual tonnage and operating hours. |
| Washing process | Jig / dense medium / combined | Matched to coal washability and product ash target. |
| Water circulation | Closed loop with thickener + filter press | Controls fresh water intake and discharge volume. |
| Product moisture | 8–12% (typical, depending on dewatering) | Affects transport cost and contract specification. |
Every unit is configured from your washability data, feed size distribution and product target — then factory-assembled and tested before shipment.

Industrial Grade · Factory assembly tested
Jig-based preparation line for thermal coal, with closed-loop slime water treatment and product dewatering.

Industrial Grade · Factory assembly tested
Deeper washing for coking coal, combining jigging or dense medium separation with fines recovery.

Industrial Grade · Factory assembly tested
Thickener, filter press and flocculant dosing designed as one water balance for zero or low discharge.

Industrial Grade · Factory assembly tested
One-key start/stop control, interlocking and remote monitoring across the whole preparation line.
Send us your raw coal capacity, feed size and product target — our engineers will recommend a suitable configuration.
Coal washability data (float-sink analysis), raw coal size distribution, target product ash and moisture, annual tonnage and site conditions. If washability data is not available, we can work from bore core samples and comparable coals.
Both. We can supply equipment only, supply with installation supervision, or deliver a turnkey plant including steel structure coordination, commissioning and operator training.
It depends on plant size and site readiness. A single-line jig plant typically commissions in weeks rather than months once mechanical completion is confirmed — the critical path is usually water and power availability on site.
