Raw Coal Crushing Station

Raw Coal Crushing Station

Controlling top size before jigging or dense medium separation — the first decision that affects everything downstream.

Application Scenarios

Raw Coal Crushing Station

A raw coal crushing station sits between the receiving hopper and the washing unit. Its job is narrow but decisive: bring run-of-mine coal down to a top size the jig or dense medium vessel can separate properly, without generating more fines than the plant can handle.

Two failure modes dominate. Crush too coarse and large lumps pass through the jig without adequate separation, carrying reject into the clean coal. Crush too fine and you create slime that loads the thickener and filter press beyond their design capacity, which then limits the whole plant.

Dehui sizes the crushing station from your raw coal size distribution and the optimum feed band of the washing unit. Where a plant runs more than one product, we check the station against the tightest requirement rather than the average.

Selection from your coal dataCommissioning support includedSpare parts against original specification
Key Specifications

Raw Coal Crushing Station — What Decides the Specification

Indicative values. Final figures follow from your coal analysis and site conditions.

ParameterTypical Range
ParameterTypical requirement Top size target50–100 mm for jig feed, 13–50 mm for dense medium cyclones
Feed sizeup to 300 mm run-of-mine, or 500 mm for primary duty
Fines toleranceSet by your slime handling capacity, not by the crusher alone
Throughput50–600 t/h per unit, with margin for peak feed
DutyContinuous, two or three shifts, abrasion-resistant liners
Where We Work

What We Have Learned on Site

A grizzly or pre-screen ahead of the crusher removes material already below target size, cutting power draw and fines generation at the same time.

Chute angles and transfer points matter as much as the crusher model. Wet coal bridges in shallow chutes; we specify angles from the actual moisture range.

Dust suppression at the discharge point is usually a permit condition, so it should be designed with the station, not added later.

FAQ

Raw Coal Crushing Station — Frequently Asked

Do I need a primary and secondary crusher?

Only if the size reduction ratio is large. Many coal plants reach the target top size in a single stage; ore duty more often needs two.

How much fines will crushing create?

It depends on the crusher type and the coal's friability. Impact crushers generate more fines than compression crushers at the same reduction ratio.

Get a Quote

Jig machine for coal washing